The project “Improving the power supply of the Arkinsky massif of the Batken region”

The project “Improving the power supply of the Arkinsky massif of the Batken region”

Lot 1 Construction and design: “110 kV overhead line from the new Razzakov PS to the Ark PS”

Lot 2 “Supply of equipment for 110/35/10 kV Razzakov PS and 110/35/10 kV Arka PS”

Start date: 01.01.2004
End date: 27.07.2007